With a new installation of over 200 KWP of power, the Alber company has partially renewed its roof surfaces and covered them with photovoltaics. The work took place over the summer months and commissioning is planned for the autumn. This means that the company can now obtain more than half of the electricity it needs from solar energy.
16/10/2022